Construction of Rize Wastewater Collection System (Lot 2) - Completion Works

Status
open for submission
Published
5 Nov 2025
Submission
Paper submission
Tender summary

The scope of work is summarised as bellow: a) Construction of approximately 3.039 km wastewater collector pipeline, including ground improvement works, b) Construction of approximately 30 m Special Crossing of river by pipejacking and/or…

What the buyer needs

  • The scope of work is summarised as bellow: a) Construction of approximately 3.039 km wastewater collector pipeline, including ground improvement works, b) Construction of approximately 30 m Special Crossing of river by…
  • CCTV inspection for approximately 6,920 m installed pipes, 2.
  • Leakage test for approximately 963 m installed pipes, 3.
  • Leakage test for approximately 44 manholes, 4.

Procurement signals

  • Procedure: EC-ENEST/ANK/2026/EA-LOP/0001-PIN
  • Procedure type: Source procedure code 47396222
  • Contract type: Works contract (31095501)
  • Submission method: Paper submission
  • Published: 5 Nov 2025

Procurement categories

CPV 42961200 CPV 45232423 CPV 45232400

CPV labels are not yet mapped locally, so the official category codes are shown as source-backed identifiers.

Programme and geography

Programme period 2014 - 2020Programme period 2021 - 2027Zone 20001026Zone 31085459Zone 31085117

Derived from official EU Funding & Tenders portal source fields. Use this as a shortlisting aid; the official tender record remains authoritative.

Source-backed details

Original identifiers and classification fields from the EU tender source.

Procedure identifier
EC-ENEST/ANK/2026/EA-LOP/0001-PIN
Business identifier
45f6880d-ef24-4290-942b-b201bd9cb308-PIN
Procedure type
Source procedure code 47396222
Contract type
Works contract (31095501)
Authority source ID
47352506
Tender timezone
Asia/Istanbul
Fetched
15 Jul 2026, 07:21 UTC
Full official description

The scope of work is summarised as bellow: a) Construction of approximately 3.039 km wastewater collector pipeline, including ground improvement works, b) Construction of approximately 30 m Special Crossing of river by pipejacking and/or horizontal drilling wastewater collector pipeline, c) Construction of 3 prefabricated GRP (Glass Reinforced Plastic) Package Type Wastewater Pumping Station (Bağdatlı, Çiftekavak and Hal) d) Approximately 12 m forced mains and associated structures, e) Construction of approximately 87 manholes, including relevant ground improvement works f) Installation of complementary SCADA System which is composed of operator workstation system, SCADA software and licences, other relevant software and licences, and system accessories g) Preparation of wastewater collection system network as-built plans for constructed sewer mains, h) Complementary works and documentation, including: 1. CCTV inspection for approximately 6,920 m installed pipes, 2. Leakage test for approximately 963 m installed pipes, 3. Leakage test for approximately 44 manholes, 4. Completion of non-completed bridge crossing works, 5. Correction of non-conformities, 6. Provision of Certificate of Origin in accordance with Sub-Clause 7.9, 7. Preparation and submission of as-built plans for completed works. The design for the wastewater collection system involves, in most cases, the complete replacement of the existing pipelines. As these existing pipelines are “live” the Contractor shall need to carefully plan the works to maintain wastewater collection services to customers as much as possible. This issue shall be valid for all “live” wastewater pumping stations. During this planning, the service continuity should be in the first priority. System temporary rearrangements to be done for service continuity shall be taking into consideration during pricing. In wastewater collection system, package wastewater pumping station shall be supplied and installed during the construction of new one. These facilities shall be in operation until the final acceptance.