Implementation of a Solar Photovoltaic Power Plant in Greenville, Liberia
Implementation of a Solar Photovoltaic Power Plant, including, but not limited to: Final (or Detailed) Design; Supply of the Solar PV plant; Installation of the Solar Power plant; Construction of the necessary supporting works (e.g. The current deadline is 28 Feb 2024, 14:00 UTC.
What the buyer needs
- Implementation of a Solar Photovoltaic Power Plant, including, but not limited to: Final (or Detailed) Design; Supply of the Solar PV plant; Installation of the Solar Power plant; Construction of the necessary supporting…
- Sub-Station and connection to the Transmission Line); and Supervision of the overall implementation activities Main components include: Module (850 kWp); Inverter (400 kWp); Batteries (900 kWh); Diesel genset (540 KVA)
Procurement signals
- Procedure: INTPA/MLW/2023/EA-OP/0209
- Procedure type: Source procedure code open
- Contract type: Supply contract (31095499)
- Submission method: Paper submission
- Published: 8 Dec 2023
Procurement categories
CPV labels are not yet mapped locally, so the official category codes are shown as source-backed identifiers.
Programme and geography
Derived from official EU Funding & Tenders portal source fields. Use this as a shortlisting aid; the official tender record remains authoritative.
Source-backed details
Original identifiers and classification fields from the EU tender source.
- INTPA/MLW/2023/EA-OP/0209
- 51aa154a-8325-4dd1-8ec9-c586479d688a-CN
- Source procedure code open
- Supply contract (31095499)
- Africa/Monrovia
- 28 Feb 2024, 14:00 UTC
- 1 Jul 2026, 09:21 UTC
Full official description
Implementation of a Solar Photovoltaic Power Plant, including, but not limited to: Final (or Detailed) Design; Supply of the Solar PV plant; Installation of the Solar Power plant; Construction of the necessary supporting works (e.g. Sub-Station and connection to the Transmission Line); and Supervision of the overall implementation activities Main components include: Module (850 kWp); Inverter (400 kWp); Batteries (900 kWh); Diesel genset (540 KVA)