Construction of Trabzon Water Supply System - Completion Works
The scope of work is summarised as below: a) 2600 house connections between the new distribution pipeline and the subscribers” water meter using PE pipes with diameter DN32 to DN 110 and 15.600 m house connection pipe line per an average… The current deadline is 21 Jul 2026, 14:30 UTC.
What the buyer needs
- The scope of work is summarised as below: a) 2600 house connections between the new distribution pipeline and the subscribers” water meter using PE pipes with diameter DN32 to DN 110 and 15.600 m house connection pipe…
- 48.500 m ) and DN250 to DN630 (appr.1500m) e) Construction of 9000 m water mains DN 630 and DN1000 f) Construction of total 18 underground air valves chambers and the discharge valve chambers g) Installation of 1055…
Procurement signals
- Procedure: EC-ENEST/ANK/2026/EA-OP/0011
- Procedure type: Source procedure code 47396220
- Contract type: Works contract (31095501)
- Submission method: Paper submission
- Published: 22 Apr 2026
Procurement categories
CPV labels are not yet mapped locally, so the official category codes are shown as source-backed identifiers.
Programme and geography
Derived from official EU Funding & Tenders portal source fields. Use this as a shortlisting aid; the official tender record remains authoritative.
Source-backed details
Original identifiers and classification fields from the EU tender source.
- EC-ENEST/ANK/2026/EA-OP/0011
- 5e075ce6-d1bf-466b-a966-46052bd47497-CN
- Source procedure code 47396220
- Works contract (31095501)
- 47352506
- Asia/Istanbul
- 21 Jul 2026, 14:30 UTC
- 15 Jul 2026, 07:21 UTC
Full official description
The scope of work is summarised as below: a) 2600 house connections between the new distribution pipeline and the subscribers” water meter using PE pipes with diameter DN32 to DN 110 and 15.600 m house connection pipe line per an average connection length of approximately 6 m b) Functional SCADA system consisting of computer hardware and software in compliance with the existing SCADA system of the End Recipient c) Construction of 16 underground flowmeters, 1 PRV chamber fitted and 7 Residual Chlorine Measurement Equipment d) Construction of additional water distribution network pipelines diameter DN110 to DN 225 ( appr. 48.500 m ) and DN250 to DN630 (appr.1500m) e) Construction of 9000 m water mains DN 630 and DN1000 f) Construction of total 18 underground air valves chambers and the discharge valve chambers g) Installation of 1055 missing valve box h) Supply and installation of 51 PRV chambers, missing ventilation pipes, missing manometers, missing valves, missing fittings and other items