5e075ce6-d1bf-466b-a966-46052bd47497-CN

Construction of Trabzon Water Supply System - Completion Works

Status
open for submission
Deadline
21 Jul 2026, 14:30 UTC
Published
22 Apr 2026
Submission
Paper submission
Tender summary

The scope of work is summarised as below: a) 2600 house connections between the new distribution pipeline and the subscribers” water meter using PE pipes with diameter DN32 to DN 110 and 15.600 m house connection pipe line per an average… The current deadline is 21 Jul 2026, 14:30 UTC.

What the buyer needs

  • The scope of work is summarised as below: a) 2600 house connections between the new distribution pipeline and the subscribers” water meter using PE pipes with diameter DN32 to DN 110 and 15.600 m house connection pipe…
  • 48.500 m ) and DN250 to DN630 (appr.1500m) e) Construction of 9000 m water mains DN 630 and DN1000 f) Construction of total 18 underground air valves chambers and the discharge valve chambers g) Installation of 1055…

Procurement signals

  • Procedure: EC-ENEST/ANK/2026/EA-OP/0011
  • Procedure type: Source procedure code 47396220
  • Contract type: Works contract (31095501)
  • Submission method: Paper submission
  • Published: 22 Apr 2026

Procurement categories

CPV 45232150 CPV 42961200 CPV 45231300 CPV 45232100

CPV labels are not yet mapped locally, so the official category codes are shown as source-backed identifiers.

Programme and geography

Programme period 2014 - 2020Programme period 2021 - 2027Zone 31085511Zone 20001026Zone 31085459Zone 31085117

Derived from official EU Funding & Tenders portal source fields. Use this as a shortlisting aid; the official tender record remains authoritative.

Source-backed details

Original identifiers and classification fields from the EU tender source.

Procedure identifier
EC-ENEST/ANK/2026/EA-OP/0011
Business identifier
5e075ce6-d1bf-466b-a966-46052bd47497-CN
Procedure type
Source procedure code 47396220
Contract type
Works contract (31095501)
Authority source ID
47352506
Tender timezone
Asia/Istanbul
Second-stage deadline
21 Jul 2026, 14:30 UTC
Fetched
15 Jul 2026, 07:21 UTC
Full official description

The scope of work is summarised as below: a) 2600 house connections between the new distribution pipeline and the subscribers” water meter using PE pipes with diameter DN32 to DN 110 and 15.600 m house connection pipe line per an average connection length of approximately 6 m b) Functional SCADA system consisting of computer hardware and software in compliance with the existing SCADA system of the End Recipient c) Construction of 16 underground flowmeters, 1 PRV chamber fitted and 7 Residual Chlorine Measurement Equipment d) Construction of additional water distribution network pipelines diameter DN110 to DN 225 ( appr. 48.500 m ) and DN250 to DN630 (appr.1500m) e) Construction of 9000 m water mains DN 630 and DN1000 f) Construction of total 18 underground air valves chambers and the discharge valve chambers g) Installation of 1055 missing valve box h) Supply and installation of 51 PRV chambers, missing ventilation pipes, missing manometers, missing valves, missing fittings and other items