9f50597e-48b5-4534-9369-eb3bcb4f20bf-CN

Construction of the Mini Hydro Power Plant in Greenville including the rehabilitation of the feeder road

Status
open for submission
Deadline
8 Mar 2024, 14:00 UTC
Published
7 Dec 2023
Submission
Paper submission
Tender summary

The Scope of Work shall include, but not be limited, to the following: • Final (or Detailed) Design. The current deadline is 8 Mar 2024, 14:00 UTC.

What the buyer needs

  • The Scope of Work shall include, but not be limited, to the following:
  • Final (or Detailed) Design.
  • Civil Works Component, including rehabilitation of the feeder road, coffer dams, impounding weir across the top of the falls (maximum of 2 metres above present dry season water level) with an overflow section (45 m long)…
  • Hydro-Mechanical and Electro-Mechanical Component, including trash racks and arm cleaners, intake gates for 2 Kaplan turbines, stoplogs for upstream and downstream, double-regulated Kaplan turbines (for 5.9 m net head)…

Procurement signals

  • Procedure: INTPA/MLW/2023/EA-OP/0170
  • Procedure type: Source procedure code open
  • Contract type: Works contract (31095501)
  • Submission method: Paper submission
  • Published: 7 Dec 2023

Procurement categories

CPV 45251120

CPV labels are not yet mapped locally, so the official category codes are shown as source-backed identifiers.

Programme and geography

Programme period 2014 - 2020Programme period 2021 - 2027Zone 31085111Zone 31085496Zone 20000942

Derived from official EU Funding & Tenders portal source fields. Use this as a shortlisting aid; the official tender record remains authoritative.

Source-backed details

Original identifiers and classification fields from the EU tender source.

Procedure identifier
INTPA/MLW/2023/EA-OP/0170
Business identifier
9f50597e-48b5-4534-9369-eb3bcb4f20bf-CN
Procedure type
Source procedure code open
Contract type
Works contract (31095501)
Tender timezone
Africa/Monrovia
Second-stage deadline
8 Mar 2024, 14:00 UTC
Fetched
1 Jul 2026, 09:21 UTC
Full official description

The Scope of Work shall include, but not be limited, to the following: • Final (or Detailed) Design. • Civil Works Component, including rehabilitation of the feeder road, coffer dams, impounding weir across the top of the falls (maximum of 2 metres above present dry season water level) with an overflow section (45 m long) and impounding section (37 m long), fishpass, flushing and headrace channel, powerhouse and substation. • Hydro-Mechanical and Electro-Mechanical Component, including trash racks and arm cleaners, intake gates for 2 Kaplan turbines, stoplogs for upstream and downstream, double-regulated Kaplan turbines (for 5.9 m net head), control systems for 2 Kaplan turbines, ancillary items and systems for 2 Kaplan turbines, Miscellaneous items for 2 Kaplan turbines