af0c05e4-e724-4460-8a65-b4e1343dd2e1-CN

Technical Assistance for Climate Change Adaptation Planning and Improved Response

Status
open for submission
Deadline
20 Jan 2026, 23:30 UTC
Estimated value
€3,000,000
Published
17 Nov 2025
Submission
Electronic submission
Tender summary

This project foresees implementation of activities focused on climate adaptation measures addressing both, river and torrential floods separately, taking into account their distinct characteristics and specificities, as outlined below: River Floods 1. The current deadline is 20 Jan 2026, 23:30 UTC. The listed estimated value is €3,000,000.

What the buyer needs

  • This project foresees implementation of activities focused on climate adaptation measures addressing both, river and torrential floods separately, taking into account their distinct characteristics and specificities, as…
  • Renewal of the Hydrological Information System (HIS) for the main sub-basins in Bosnia and Herzegovina, including flood events from 2010 to the present.
  • Analysis of the impact of existing reservoirs on the water regime, with proposals for improving the management of high-water waves and enhancing water retention during dry periods.
  • Development of guidelines for flood protection of agricultural land.

Procurement signals

  • Procedure: EC-ENEST/SJJ/2025/EA-RP/0135
  • Procedure type: Source procedure code 47396224
  • Contract type: Services contract (31095498)
  • Submission method: Electronic submission
  • Published: 17 Nov 2025

Procurement categories

CPV 90700000

CPV labels are not yet mapped locally, so the official category codes are shown as source-backed identifiers.

Programme and geography

Programme period 2014 - 2020Programme period 2021 - 2027Zone 20000836Zone 31085459Zone 31085117

Derived from official EU Funding & Tenders portal source fields. Use this as a shortlisting aid; the official tender record remains authoritative.

Source-backed details

Original identifiers and classification fields from the EU tender source.

Procedure identifier
EC-ENEST/SJJ/2025/EA-RP/0135
Business identifier
af0c05e4-e724-4460-8a65-b4e1343dd2e1-CN
Procedure type
Source procedure code 47396224
Contract type
Services contract (31095498)
Authority source ID
47352506
Tender timezone
Europe/Sarajevo
Fetched
15 Jul 2026, 07:21 UTC
Full official description

This project foresees implementation of activities focused on climate adaptation measures addressing both, river and torrential floods separately, taking into account their distinct characteristics and specificities, as outlined below: River Floods 1. Renewal of the Hydrological Information System (HIS) for the main sub-basins in Bosnia and Herzegovina, including flood events from 2010 to the present. 2. Analysis of the impact of existing reservoirs on the water regime, with proposals for improving the management of high-water waves and enhancing water retention during dry periods. 3. Development of guidelines for flood protection of agricultural land. 4. Preparation of the manual “Living with Floods”, providing an overview of necessary measures and best practices for flood risk management. Torrential Floods 1. Development of a cadastre of torrential basins, including a sensitivity model based on existing erosion maps. 2. Preparation of a study on increasing basin water retention capacity through measures aimed at reducing runoff and sediment transport, accompanied by a catalogue of applicable interventions.