Bridging contract TECHNICAL SECRETARIAT OF THE GROUP OF NOTIFIED BODIES UNDER THE CONSTRUCTION PRODUCTS REGULATION 305/2011/EU
To bridge the gap between the old contract and the signing of the new one. • To prepare meetings of the Advisory Group in Brussels: 1.
What the buyer needs
- To bridge the gap between the old contract and the signing of the new one.
- To prepare meetings of the Advisory Group in Brussels: 1. preparation of the agenda in collaboration with the Chairman of the Group of notified bodies 2. co-draft of technical working papers, meeting reports and…
- to ensure the continuity of the work of the technical secretariat throughout the contract;
- to collect all useful technical information and, at the request of the Commission services, to format them to allow notified bodies to carry out and co-ordinate their activity in the most effective way;
Procurement signals
- Procedure: EC-GROW/2026/LVP/0061-EXA
- Procedure type: Source procedure code 47396214
- Contract type: Services contract (31095498)
- Submission method: Electronic submission
- Published: 16 Jun 2026
Procurement categories
CPV labels are not yet mapped locally, so the official category codes are shown as source-backed identifiers.
Programme and geography
Derived from official EU Funding & Tenders portal source fields. Use this as a shortlisting aid; the official tender record remains authoritative.
Source-backed details
Original identifiers and classification fields from the EU tender source.
- EC-GROW/2026/LVP/0061-EXA
- c55be9da-3c3b-4c7f-8cb9-2e1a453efefb-EXA
- Source procedure code 47396214
- Services contract (31095498)
- 47352500
- Europe/Brussels
- 17 Jun 2026, 21:04 UTC
Full official description
To bridge the gap between the old contract and the signing of the new one. • To prepare meetings of the Advisory Group in Brussels: 1. preparation of the agenda in collaboration with the Chairman of the Group of notified bodies 2. co-draft of technical working papers, meeting reports and recommendations, 3. preparation of conclusions and minutes of meetings. • to ensure the continuity of the work of the technical secretariat throughout the contract; • to collect all useful technical information and, at the request of the Commission services, to format them to allow notified bodies to carry out and co-ordinate their activity in the most effective way; • to propose answers or solutions to the technical problems raised at the meetings of notified bodies; • to participate in the meetings of the sector groups of notified bodies as far as necessary, in order to identify problems in these sectors that need attention of the Advisory Group. • to attend, on invitation, meetings organised by the Commission services in Brussels as well as at meetings of the inter-sector groups of notified bodies referred to above.