f3b647f8-a297-4ddc-bca5-2ea00ada7a6b

Construction of Sarajevo – Pale Cycling Trail

Status
open for submission
Deadline
21 Jul 2023, 12:00 UTC
Contracting authority
DGNEAR
Published
12 May 2023
Tender summary

Construction of the Sarajevo - Pale cycling trail will consider the starting position from Sarajevo City Hall “Vijecnica” , to Dariva pedestrian zone and local access roads until the very exit to the narrow-gauge railway route overlooking… The current deadline is 21 Jul 2023, 12:00 UTC.

What the buyer needs

  • Construction of the Sarajevo - Pale cycling trail will consider the starting position from Sarajevo City Hall “Vijecnica” , to Dariva pedestrian zone and local access roads until the very exit to the narrow-gauge railway…
  • The end of the route is defined in the vicinity of the old railway station Pale, which is located nearby the intersection of a local road running along the narrow-gauge railway route and the regional road connecting the…
  • Reconstruction of 2 (two) bridges on the rout that also require testing and laying out of the bedand railing.
  • Reconstruction of 9 (nine) tunnels of various design, from carved tunnels to stone lined tunnels,including tunnels lighting with the solar panels.

Procurement signals

  • Procedure: NEAR/SJJ/2023/EA-LOP/0094
  • Procedure type: Source procedure code OPEN
  • Contract type: Works contract (31095501)
  • Published: 12 May 2023

Procurement categories

CPV 45220000 CPV 45221000 CPV 45000000 CPV 45223000

CPV labels are not yet mapped locally, so the official category codes are shown as source-backed identifiers.

Programme and geography

Programme period 2014 - 2020Programme period 2021 - 2027Zone 20000836Zone 31085459Zone 31085117

Derived from official EU Funding & Tenders portal source fields. Use this as a shortlisting aid; the official tender record remains authoritative.

Source-backed details

Original identifiers and classification fields from the EU tender source.

Procedure identifier
NEAR/SJJ/2023/EA-LOP/0094
Business identifier
14142en
Procedure type
Source procedure code OPEN
Contract type
Works contract (31095501)
Second-stage deadline
21 Jul 2023, 12:00 UTC
Fetched
15 Jul 2026, 07:21 UTC
Full official description

Construction of the Sarajevo - Pale cycling trail will consider the starting position from Sarajevo City Hall “Vijecnica” , to Dariva pedestrian zone and local access roads until the very exit to the narrow-gauge railway route overlooking the site called “Vrelo Života”. The end of the route is defined in the vicinity of the old railway station Pale, which is located nearby the intersection of a local road running along the narrow-gauge railway route and the regional road connecting the centre of Pale and Mount Jahorina.The planned reconstruction works subject to this contract are: Up to 15 km of route reconstruction. Reconstruction of 2 (two) bridges on the rout that also require testing and laying out of the bedand railing. Reconstruction of 9 (nine) tunnels of various design, from carved tunnels to stone lined tunnels,including tunnels lighting with the solar panels.