Funding for deploying alternative fuel infrastructure for heavy-duty road vehicles and airport ground operations along TEN-T network.
This call supports building alternative fuel supply infrastructure for road transport and airport ground operations. It focuses on heavy-duty vehicle charging pools and electrification at TEN-T airports. The aim is to help decarbonise transport by deploying infrastructure compliant with EU regulations.
Likely relevant for
- Transport infrastructure developers
- Energy infrastructure providers
- Public authorities managing transport networks
- Airport operators
- Heavy-duty vehicle fleet operators
Project signals
What it funds
- Deployment of alternative fuels supply infrastructure for road transport and airport ground operations
- Publicly accessible heavy-duty vehicle charging pools with minimum 1MW chargers
- Electrification infrastructure for airport ground operations including electricity and preconditioned air supply
- Infrastructure located on or near TEN-T road network and TEN-T airports
- Synergetic elements like on-site renewable electricity generation and grid connection up to 20% of total costs
Expected outcomes
- Increased availability of high-power charging infrastructure for heavy-duty vehicles
- Electrification of airport ground operations reducing emissions
- Compliance with AFIR and TEN-T regulations
- Enhanced decarbonisation of transport along TEN-T network
Who can apply / participate
- Public and private entities involved in transport infrastructure deployment
- Airport operators
- Transport infrastructure managers
- Check call document for consortium composition rules
- Infrastructure must be located on or near TEN-T network and TEN-T airports
- Applicants must comply with AFIR and TEN-T regulations
- Operation and maintenance commitment for 5 years required
- Specific eligible applicant types and consortium size
- Funding rates and co-financing requirements
Must check before shortlisting
- Eligibility criteria details in call document section 6
- Consortium composition and funding rules
- Specific technical compliance with AFIR and TEN-T regulations
Money
Total budget of approximately EUR 130 million for 2026 under CEF Infrastructure Projects.
- Total budget — 130000000EURBudget for the 2026 call year
Application notes
- Single-stage submission model.
- Proposal page limits and layout as per call document section 5 and application form
- Eligibility and admissibility conditions in call document section 6
- Financial and operational capacity requirements in call document section 7
- Evaluation criteria and award process in call document section 8 and 9
- Legal and financial set-up described in call document section 10
- Prepare proposal according to application form and call document
- Submit proposal via Funding & Tenders Portal by deadline
- Ensure compliance with eligibility and admissibility criteria
- Provide required supporting documents such as budget tables and letters of support
- Costs related to vehicles, land acquisition, administrative and staff costs are not eligible
- Operating expenditure and upgrade of existing infrastructure not eligible
- Synergetic elements limited to 20% of total eligible costs
Derived from official EU Funding portal source · updated 2 Jul 2026, 08:10 UTC. Use this as a shortlisting aid; the official call text remains authoritative.
Related calls
These funding calls are closely related and may be worth considering as part of the same funding landscape.
Official source text
Fine print from the EU source record. Expand when you need the original wording.
Topic description
Objective: The objective of this call is to support the deployment of alternative fuels supply infrastructure for road transport, and airport ground operations, contributing to decarbonising transport along the TEN-T network. Scope: 1. General provisions Activities eligible for funding under this call relate to the deployment of alternative fuels supply infrastructure. The infrastructure shall be deployed in accordance with: Regulation (EU) 2023/1804 of the European Parliament and of the Council of 13 September 2023 on the deployment of alternative fuels infrastructure (hereafter “the AFIR Regulation”) and, Regulation (EU) 2024/1679 of the European Parliament and of the Council of 13 June 2024 on Union guidelines for the development of the trans-European transport network, amending Regulation (EU) 2021/1153 and (EU) 913/2010 and repealing Regulation (EU) 1315/2013, and, The requirements listed below. The definitions set in AFIR and the TEN-T Regulations apply to this call for proposals. 2. Publicly accessible charging pools for Heavy Duty Vehicles (HDV) Infrastructure Publicly accessible recharging pools dedicated to heavy-duty vehicles equipped with at least 4 Megawatt Charging System (MCS) recharging points having each a minimum power output of 1MW; however not necessarily charging simultaneously at their maximum power. Publicly accessible recharging pools dedicated to heavy-duty vehicles equipped with a combination of at least 4 MCS recharging points having each a minimum power output of 1MW) and of Combined Charging System (CCS) recharging points having each a minimum power output of 350kW (however not necessarily charging simultaneously at their maximum power). In this case, for each pool, the number of supported recharging points with a minimum power output of 350kW cannot exceed the number of supported recharging points with a minimum power output of 1MW. The following elements strictly related to the recharging infrastructure deployment inside the recharging pool area are eligible for support: construction costs including chargers or power cabinet serving charging satellites, canopy, safety and security devices, parking, circulation, and electricity infrastructure (including cabling, electricity substations, batteries and on-site dynamic energy management devices). Locations The recharging infrastructure must be located: on the TEN-T road network or within 3 km driving distance from the nearest exit of a TEN-T road, in Safe and Secured Parking Areas (SSPA) certified Bronze, Silver, Gold or Platinum levels, in line with Commission Delegated Regulation (EU) 2022/1012, and located on the TEN-T road network or within 3 km driving distance from the nearest exit of a TEN-T road [1], in TEN-T urban nodes, including in port and airport areas provided that the horizontal requirements mentioned in 2.2.5 below are fulfilled. 3. Electrification of airport ground operations Infrastructure Electricity and preconditioned air supply to stationary aircraft and airships through fixed or zero-tailpipe emission mobile equipment. Electricity supply facilities for ground operation vehicles. Electricity supply facilities for electric or hybrid electric aircraft and airships. Related and electricity storage inside the airport area. Location In TEN-T airports. 4. Horizontal requirements for all alternative fuels infrastructure The beneficiary shall operate and maintain the supported infrastructure for a minimum period of 5 years starting from the end date of the related grant agreement. For beneficiaries operating under a Public Service Obligation contract which expires before the end of the 5-year period, this requirement will be fulfilled if the supported infrastructure is transferred and operated by the successor contract holder until the end of the 5-year period. 5. Horizontal requirements for all publicly accessible electricity recharging points for Heavy Duty road transport The recharging points must comply with the requirements set in the AFIR Regulation. The charging pools must be publicly accessible on a 24/7 basis irrespective of whether the infrastructure is located on a public or private site or premise. The recharging pools must be equipped with an energy management system allowing a dynamic allocation of power to the various recharging points. The HDV charging pools must be exclusively dedicated to HDV usage and designed accordingly in terms of dimension and circulation. Exclusive use can be ensured by signage combined with one or more of the non-exhaustive following measures: physical segregation from Light Duty Vehicles if any on the same location, digital restrictions for HDV recognition, The power capacity of the HDV recharging pool cannot be shared -in whole of in part- to supply demand at a Light Duty Vehicle (LDV) pool even if both pools are using the same grid connection. Separate metering and load management must ensure HDV power availability is ring-fenced at all times. 24/7 phone assistance shall be provided to end users. 6. Non eligible costs costs related to vehicles; costs related to land acquisition, renting/leasing of facilities, procurement and permits; costs related to grid connection equipment owned by the Distribution System Operator (DSO) or the Transmission System Operator (TSO); administrative costs, including travel and subsistence costs and any indirect costs; staff costs of the applicant even for work done in-house; costs relating to any type of studies, design and work supervision, commissioning, communication, dissemination and project management either in-house or outsourced; Operating Expenditure (OPEX) including consumables and energy consumption; upgrade of existing electric recharging infrastructure; recharging pools for electric vehicles located in elevated or underground parking buildings or in car/truck dealer or other premises, that are typically utilized by a specific group of users. 7. Synergetic elements The following activities are eligible as synergetic elements: On-site electricity generation based on renewable energy sources; Electricity grid connection. The total costs of these synergetic elements shall not exceed 20% of the total eligible costs of the Action and part of a dedicated work package. [1] In Safe and Secure Parking Areas (SSPA), only the cost of chargers and electricity infrastructure serving the recharging points will be eligible. Surfacing, lighting, civil works, safety and security components, canopies and other service buildings will not be eligible for funding.
Conditions and documents
Conditions
1. Admissibility conditions: Proposal page limit and layout
described in section 5 of the call document.
Proposal page limits and layout: described in Part B of the Application Form available in the Submission System.
2. Eligible countries
described in section 6 of the call document.
3. Other eligibility conditions
described in section 6 of the call document.
4. Financial and operational capacity and exclusion
described in section 7 of the call document.
5a. Evaluation and award: Submission and evaluation processes
described section 8 of the call document and the Online Manual.
5b. Evaluation and award: Award criteria, scoring and thresholds
described in section 9 of the call document.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in section 4 of the call document.
6. Legal and financial set-up of the grants
described in section 10 of the call document.
Call document and annexes:
Application form templates
Standard application form the application form specific to this call is available in the Submission System
Additional documents:
Support information
For help related to this call, please contact CINEA-CEF-TRANSPORT-CALLS@ec.europa.eu Funding & Tenders Portal FAQ – Submission of proposals . IT Helpdesk – Contact the IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc. Online Manual – Step-by-step online guide through the Portal processes from proposal preparation and evaluation to reporting on your ongoing project. Valid for all 2021-2027 programmes
Raw budget overview
{
"budgetYearsColumns": [
"2026"
],
"budgetTopicActionMap": {
"114882": [
{
"action": "CEF-T-2026-AFIFGEN-COSTS - CEF-INFRA CEF Infrastructure Projects",
"expectedGrants": 0,
"minContribution": 0,
"maxContribution": 0,
"budgetYearMap": {
"2026": "130000000"
},
"plannedOpeningDate": "2026-06-18",
"deadlineModel": "single-stage",
"deadlineDates": [
"2026-10-06"
]
}
]
}
}