European Maritime Space and Inland ports (AFIF) - works
Funding for works modernising TEN-T maritime and inland ports to reduce environmental impact via green shipping technologies.
This call funds infrastructure works to modernise maritime and inland ports on the TEN-T network. It supports onshore power supply, charging infrastructure, and retrofitting vessels with green energy systems. The goal is to reduce transport emissions and promote sustainable shipping technologies.
Likely relevant for
- Port authorities
- Maritime transport infrastructure developers
- Shipbuilders and retrofitters
- Renewable energy technology providers
- Environmental NGOs focused on maritime transport
Project signals
What it funds
- Works projects modernising maritime transport infrastructure on TEN-T network
- Deployment of onshore power supply and charging infrastructure in TEN-T maritime and inland ports
- Fitting or retrofitting energy systems of inland waterway and short sea shipping vessels with green technologies
- Installation of renewable energy generation and energy storage systems at ports as synergetic elements
Expected outcomes
- Reduced environmental impact of maritime and inland waterway transport
- Increased use of electric, hybrid, hydrogen, ammonia, methanol, and biomethane propulsion systems
- Improved port infrastructure for sustainable shipping
- Support for EU manufacturing capacity and maritime technology innovation
Who can apply / participate
- Port authorities and managing entities
- Ship owners and operators of eligible vessels
- Consortia including technology providers and infrastructure developers
- Single-stage submission model
- Consortium composition and eligibility detailed in call document
- Projects must be located in TEN-T maritime or inland ports
- Vessels must fly EU flag and serve TEN-T ports
- Vessels must meet size and service route criteria
- Support limited to fitting or retrofitting costs of energy systems
- Non-eligible costs include land acquisition, administrative costs, and operating expenses
- Specific eligible countries and detailed consortium rules must be checked in call document
Must check before shortlisting
- Eligibility of applicant country and entity type
- Compliance with vessel size and flag requirements
- Budget limits per vessel and project scope
- Deadline and submission requirements
Money
Total budget of EUR 200 million for 2026. Maximum grant per vessel is EUR 5 million.
- Total budget — 200000000EURAllocated for works projects under this call in 2026
Application notes
- Single-stage submission model. Detailed application form and templates available in the submission system.
- Proposal page limit and layout as per call document section 5
- Eligibility and admissibility conditions in call document section 6
- Financial and operational capacity requirements in section 7
- Evaluation criteria and process in sections 8 and 9
- Legal and financial set-up in section 10
- Prepare proposal following call document guidelines
- Submit via Funding & Tenders Portal before deadline
- Include detailed cost breakdown for vessel retrofitting
- Provide letters of support and environmental compliance files
- Fitting or retrofitting contract must be signed after call publication and before 31 Dec 2027
- Non-eligible costs include land acquisition, administrative costs, and operating expenses
- Projects must ensure non-discriminatory access to infrastructure
Derived from official EU Funding portal source · updated 2 Jul 2026, 08:11 UTC. Use this as a shortlisting aid; the official call text remains authoritative.
Related calls
These funding calls are closely related and may be worth considering as part of the same funding landscape.
Official source text
Fine print from the EU source record. Expand when you need the original wording.
Topic description
Objective: The objective of this call is to modernise maritime transport infrastructure on the TEN-T network and reducing the environmental impact of transport through efficient short sea shipping links and greening of inland shipping. Scope: Only works projects related to: Projects supporting the deployment of Onshore-power supply and charging infrastructure in TEN-T maritime and inland ports in accordance with Regulation 2023/1804 [1]. The fitting or retrofitting of the energy systems of inland waterway vessels and short sea shipping vessels (including ferries) [2], with electric, hybrid, H2, ammonia, methanol and biomethane technologies, substitute sources of energy [3] and the installation of wind assisted propulsion systems (WAPS). For projects supporting the deployment of Onshore-power supply and charging infrastructure in TEN-T maritime and inland ports: Projects may include Onshore-power supply systems and Shore-side Battery Charging (SBC) systems at port-side. These systems shall be intended for seagoing freight/passenger vessels (including tugboats and cruise vessels) and inland waterway vessels. Projects may include an upgrade of electrical grid within the maritime and inland ports if it is needed for the Onshore-power supply systems or the SBC systems. Works projects in TEN-T maritime and inland ports may include on-site renewable energy generation (e.g. photovoltaic power plants, wind turbines, etc.), grid connection from the port to the grid outside of the port, and Shore side Power Banks (SPB) i.e. Energy Storage Systems in the form of batteries. These elements may be included as a synergetic element in accordance with Section 9.6 of the Work Programme and shall be primarily used for the Onshore-power supply systems and the SBC systems. Such synergetic elements must improve the socio-economic, climate or environmental benefits of the project and may not exceed 20% of the total eligible costs of the project. Facilities and infrastructure supported under CEF must be accessible for use by all operators on a non-discriminatory basis. For merged port entities or entities managing more than one maritime port, only the geographic area of the maritime port indicated in Annex II to the TEN-T Regulation may be included in the project. For the projects supporting fitting or retrofitting of energy systems of short sea shipping vessels’ (including ferries) and inland waterway vessels, the support shall be provided to: Maritime ferries of at least 2000 GT engaged in regular service for the transport of passengers, vehicles and / or cargo on fixed route(s) between two or more maritime ports of which at least one is a TEN-T core or comprehensive maritime port. Short sea shipping vessels of at least 2000 GT operating passengers and/or freight transport services in coastal sea areas and calling at least at one TEN-T core or comprehensive maritime port. Inland waterway vessels operating in the TEN-T inland waterways transport network as set out in Section 2 of the TEN-T Regulation N° 2024/1679, within the scope of Directive (EU) 2016/1629 (vessels longer than 20 meters with more than 12 passengers' capacity). Support shall be limited to the costs of fitting or retrofitting of the vessels’ energy systems (the fully electric or hybrid power propulsion system, wind-assisted propulsion system, substitute sources of energy and energy storage system both used predominantly for a propulsion system). Applications shall contain a clear cost breakdown per component / equipment necessary for the fitting / retrofitting of the vessels’ energy system(s). More specifically, the support to power propulsion system shall be limited to: the fitting of newbuilds with electric, hybrid, H2, ammonia or methanol technologies; retrofitting of existing vessels with electric, hybrid, H2, ammonia, methanol or biomethane technologies. The hybrid electric vessels must have, as a result of fitting or retrofitting, Shore-side Battery charging (SBC) and their battery capacity shall be sufficient to cover at least 10 Nautical miles. The fitting or retrofitting contract must be signed after the call publication date and no later than 31 December 2027. Support shall not be provided to Exclusive Day trip tourism vessels, recreational craft, tugboats, icebreakers or cruise vessels. The applicants shall indicate what fuelling and recharging capacities are currently or will be available by the end of the project at the ports served by the supported vessels. The applicants should explain the contribution of their proposed project to the development of EU manufacturing capacity and made in EU technologies in line with the EU Industrial Maritime Strategy. For the fitting or retrofitting of the vessels, the grant amount shall be limited to a maximum of EUR 5 million per vessel. The vessels receiving support must fly an EU flag and shall serve at least one TEN-T maritime or inland port for a minimum of 5 years after the end of the project. Non eligible costs costs related to land acquisition, renting/leasing of facilities, procurement and permits; costs related to grid connection equipment owned by the Distribution System Operator (DSO) or the Transmission System Operator (TSO); administrative costs, including travel and subsistence costs and any indirect costs; staff costs of the applicant even for work done in-house; costs relating to any type of studies, design and work supervision, communication, dissemination and project management either in-house or outsourced; Operating Expenditure (OPEX) including consumables and energy consumption; upgrade of existing electric recharging infrastructure; [1] Regulation (EU) 2023/1804 of the European Parliament and of the Council of 13 September 2023 on the deployment of alternative fuels infrastructure, and repealing Directive 2014/94/EU (OJ L 234, 22.9.2023, pp. 1–47, ELI: http://data.europa.eu/eli/reg/2023/1804/oj ) [2] Vessels engaged in inland waterway and short sea shipping traffic as defined in the TEN-T Regulation. [3] ‘Substitute sources of energy’ means renewable energy generated on board or electricity supplied from OPS, as defined in article 3(8) of the Regulation (EU) 2023/1805 of the European Parliament and of the Council of 13 September 2023 on the use of renewable and low-carbon fuels in maritime transport, and amending Directive 2009/16/EC).
Conditions and documents
Conditions
1. Admissibility conditions: Proposal page limit and layout
described in section 5 of the call document.
2. Eligible countries
described in section 6 of the call document.
3. Other eligibility conditions
described in section 6 of the call document.
4. Financial and operational capacity and exclusion
described in section 7 of the call document.
5a. Evaluation and award: Submission and evaluation processes
described section 8 of the call document and the Online Manual.
5b. Evaluation and award: Award criteria, scoring and thresholds
described in section 9 of the call document.
5c. Evaluation and award: Indicative timeline for evaluation and grant agreement
described in section 4 of the call document.
6. Legal and financial set-up of the grants
described in section 10 of the call document.
Call document and annexes:
CEF-T-2026-SUSTMOBGEN-EMS-WORKS
Application form templates
Standard application form — the application form specific to this call is available in the Submission System
Additional documents:
Support information
For help related to this call, please contact CINEA-CEF-TRANSPORT-CALLS@ec.europa.eu Funding & Tenders Portal FAQ – Submission of proposals . IT Helpdesk – Contact the IT helpdesk for questions such as forgotten passwords, access rights and roles, technical aspects of submission of proposals, etc. Online Manual – Step-by-step online guide through the Portal processes from proposal preparation and evaluation to reporting on your ongoing project. Valid for all 2021-2027 programmes
Raw budget overview
{
"budgetYearsColumns": [
"2026"
],
"budgetTopicActionMap": {
"114865": [
{
"action": "CEF-T-2026-SUSTMOBGEN-EMS-WORKS - CEF-INFRA CEF Infrastructure Projects",
"expectedGrants": 0,
"minContribution": 0,
"maxContribution": 0,
"budgetYearMap": {
"2026": "200000000"
},
"plannedOpeningDate": "2026-06-18",
"deadlineModel": "single-stage",
"deadlineDates": [
"2026-10-06"
]
}
]
}
}